Since the 100 kWp solar power plant at our ETPACK site was commissioned at the end of November 2021, the plant has produced :
- 153MWh of which 82 MWh self-consumed and 71 MWh redirected to the grid
Thanks to this investment, ETPACK is helping to reduce CO2 emissions and cut its electricity consumption.